Night Shift — first machine that works through a lunar night

Power·2026–2030Market opens soon
← All prizes

Prize pool

—

Providers

7

Target window

2026–2030

Deliver at least 10 watts of electricity, continuously, for 354 hours, in a vacuum chamber colder than 100 kelvin, with nothing plugged in — and still be delivering the same 10 watts at the end. Publish the data. The 98% rule is a last-hour / first-hour slope limit, not a 9.8 W waiver: every rolling hour must stay ≥ 10.0 We. Unlike NASA Watts on the Moon (store and distribute night power), this is one unplugged article plus a commercial procurement rule. The slot is the power system, not the host lander. Firefly, Intuitive Machines, and ispace sit in the Open Field only if they bring their own article. State plutonium does not clear. Thermal wadis compete in the Open Field; mass and occupied volume are published so a warehouse-sized heat store cannot hide.

Competitors are listed at MoonDAO’s editorial discretion. Listing does not mean the organization has entered, endorsed, or is affiliated with this prize. Bets are on outcomes, not on any affiliation.

The ETH market for this race opens soon. Predict the winner for free now. See this race on Moon Base Zero.

Competitors

Click a competitor to predict them as the winner.

ZPZeno Power

—

chance

VLVoyager Lunar Systems

—

chance

VSVenturi Space

—

chance

PAPerpetual Atomics

—

chance

CCCNNC / CIAE

—

chance

RORosatom

—

chance

ISISRO

—

chance

Capability criteria (draft)

  1. 1Nothing crosses the chamber boundary into the article except data

    No wall power, heat, propellant, coolant, gas, or mass during the window

  2. 2Run in a lunar-night thermal-vacuum environment

    ≤ 1×10⁻⁵ torr and ≤ 100 K shroud throughout, with published excursion limits

  3. 3Deliver useful electrical work continuously

    ≥ 10.0 We averaged over every rolling 60-minute window for 354 hours, scored on the lower bound of the entrant's own measurement uncertainty rather than the raw reading

  4. 4Output is undiminished at the end of the night

    Mean power in the last hour ≥ 98% of mean power in the first hour. This is a slope limit, not a 9.8 W waiver — the 10.0 We rolling-hour floor is separate

  5. 5Publish article mass and occupied chamber volume

    Weigh-in and convex envelope as mounted. Not a cap — a thermal wadi must be visible on the scoreboard

  6. 6Independent instruments, two site visits

    Day 0: weigh, seal, install the verifier's sensors. Day 15: check seals and take the files. Sensors must be traceably calibrated to ≤ 0.5% expanded uncertainty with the budget published, because a legitimately calibrated meter reading high is the cheapest way to pass without clearing the bar. Live telemetry and clock-in-frame video corroborate; they do not replace the meters

  7. 7The energy source can be bought

    Invoice or published price for the fuel or stored energy used in the run